To receive competitive purchasing options on part number DD101 LONG LEAD by Crl Components Inc, look no further than NSN Direct. For your reference, this item has the NSN 5910-00-678-8157 and is listed with the description “Capacitor Fixed Ceramic Dielectr.” If this matches your needs, we encourage you to fill out the partially-completed quote request form on this page to kick off procurement. By providing comprehensive information about your requirements, such as your desired quantity, pricing, and fulfillment speed, our experts can formulate the most fitting solutions for you. We want to ensure that this process is quick and effortless, so we routinely respond to requests within 15 minutes of receiving and reviewing them.
Note : We Will Not Share Your Information To Any Third Parties.
In addition to our streamlined quotation service, we also aim to make the process of finding products simple. As such, if you require other Crl Components Inc parts produced under the CAGE Code 71590, you can peruse our manufacturer or CAGE Code catalogs, or use our search engine and filters. Furthermore, if you want to locate items similar to part number DD101 LONG LEAD, you can glean from the first four digits of its NSN 5910-00-678-8157 that it belongs to the FSC 5910 Capacitors. This being said, do not hesitate to request quotes on part number DD101 LONG LEAD and any other NSN parts that we feature to experience unrivaled procurement.
NSN | FSC | NIIN | CLS | Hazmat | DEMIL | Cancelled NSN |
---|---|---|---|---|---|---|
5910-00-678-8157 Item PartTypeName: CAPACITOR,FIXED,CERAMIC DIELECTR | 5910 | 006788157 | 0 | P | ||
CIIC | HCC | ESD | PMIC | Criticality | ENAC | |
U | A | 0 | ||||
Part Number | ISC | RNVC | RNCC | HCC | MSDS | SADC |
064-064 | 3 | 9 | 5 |
MRC | Criteria | Characteristic |
---|---|---|
AAQL | BODY STYLE | W/O MTG FACILITIES,RADIAL TERMINALS |
AARG | RELIABILITY INDICATOR | NOT ESTABLISHED |
ABJT | TERMINAL LENGTH | 1.500 INCHES MINIMUM |
ABPM | BODY DIAMETER | 0.290 INCHES MAXIMUM |
ADAQ | BODY LENGTH | 0.156 INCHES MAXIMUM |
AEBS | CENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO DIAMETER | 0.250 INCHES NOMINAL |
AEBT | TERMINAL DIAMETER | 0.025 INCHES NOMINAL |
AEBZ | SCHEMATIC DIAGRAM DESIGNATOR | NO COMMON OR GROUNDED ELECTRODE(S) |
AGAV | END ITEM IDENTIFICATION | MISSILE,AI-TO-AIR,PHOEBNIX (AIM-54); TELETYPE,MODEL 28; TEST CONSOLES,MINI-SACE; ENGINE,AIRCRAFT TF33-PW-102 (C-135E,EC-135H/K/P); MISSILE,AIR-TO-AIR,SPARROW (AIM-7); SUPPORT EQUIPMENT,MX PEACEKEEPER MISSILE; SUPPORT EQUIPMENT,B |
CQBQ | CAPACITANCE VALUE PER SECTION | 100.000 PICOFARADS SINGLE SECTION |
CQFB | VOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE | -56.0/22.0 WITHOUT VOLTAGE APPLIED SINGLE SECTION |
CQJJ | NONDERATED OPERATING TEMP | -55.0 DEG CELSIUS MINIMUM AND 85.0 DEG CELSIUS MAXIMUM |
CQWM | NONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION | 1000.0 DC SINGLE SECTION |
CRTL | CRITICALITY CODE JUSTIFICATION | FEAT |
CRTP | TOLERANCE RANGE PER SECTION | -10.00 TO 10.00 PERCENT SINGLE SECTION |
CWJK | CASE MATERIAL | PLASTIC |
CWPK | INSULATION RESISTANCE AT REFERENCE TEMP | 10000.0 MEGOHMS |
CWSG | TERMINAL SURFACE TREATMENT | SOLDER |
FEAT | SPECIAL FEATURES | WEAPON SYSTEM ESSENTIAL |
TTQY | TERMINAL TYPE AND QUANTITY | 2 UNINSULATED WIRE LEAD |
If You’re Ever Looking for NSN parts Or Have an Aircraft On Ground Situation, Don’t forget That We offer Competitive Pricing and Guaranteed On-Time Delivery.
Request for Quote